Tetra Reduces Downtime with AI-Powered Document Retrieval
Introduction:
A leading corrugated box manufacturer with seven facilities, faced a substantial challenge: frequent maintenance incidents leading to prolonged machine downtime. With approximately 3,000 incidents per site annually, the company sought a solution to streamline document retrieval and accelerate issue resolution. Implementing an AI-powered document search system delivered remarkable results, significantly reducing downtime and boosting operational efficiency.
The Challenge:
- Massive Incident Volume: Each of their seven sites experienced roughly 3,000 maintenance incidents annually, totaling 21,000 incidents company-wide.
- Significant Time Loss: Technicians spent an average of 20 minutes per incident searching for critical documentation, resulting in substantial cumulative downtime.
- Inefficient Workflow: The need to leave the factory floor and navigate complex file systems hindered technicians' ability to respond quickly to issues.
The Solution:
Tetra deployed an AI-powered document search system across all seven sites, providing technicians with tablets on the factory floor. Key features included:
- Instant access to documentation at the point of need.
- Natural language query capabilities for efficient information retrieval.
- A reduction in retrieval time from 20 minutes to 5 minutes per incident.
The Results:
1. Time Savings:
- Incidents per site: 3,000
- Total incidents: 3,000 incidents/site * 7 sites = 21,000 incidents
- Time saved per incident: 20 minutes - 5 minutes = 15 minutes
- Total time saved: 21,000 incidents * 15 minutes/incident = 315,000 minutes
- Total hours saved: 315,000 minutes / 60 minutes/hour = 5,250 hours
2. Increased Machine Uptime:
- The 5,250 hours saved directly translate to increased machine uptime. This represents a significant boost in production capacity. The firm avoided purchasing 2 machines resulting in saved factory space and millions of dollars in equipment costs.
3. Cost Savings:
- Annual FTE Cost: $150,000
- Hourly FTE Cost: $150,000 / (52 weeks * 40 hours) = $72.12 per hour approximately.
- Labor cost savings: 5,250 hours * $72.12/hour = $378,630
Additional Benefits:
- Enhanced Technician Productivity: Technicians can focus on problem-solving rather than document retrieval.
- Optimized Production Output: Reduced downtime leads to increased production efficiency.